Recent Projects
Refurbishment of Domestic Property
We undertook a renovation of a three bedroom semi-detached house in Hull containing eight rooms. The ground floor had the floorboards replaced, walls removed and moved, plastering and decorating. New kitchen units and boiler were installed in the kitchen and the electrics rewired throughout. Two new bathroom suites were installed and upstairs bedrooms were plastered and decorated throughout. All works were completed to high quality standards and within the six week scheduled time period.